From: route@monster.com
Sent: Saturday, April 16, 2016 2:04 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: NSN Construction Manager
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
Matthew G. Cooper
2665 Country
Meadow Wylie, TX 75098 | 214-966-0573 | cooper.matthew@yahoo.com
Overview
Over 15 years of
work experience in the electrical and telecommunications fields Experience: Wavsys/Nokia
Sep 2014-Mar2015 TD-LTE Field
Engineer · Contracted to Nokia for 2.5 MHZ TD-LTE Sprint project. · Performed Installation, Commission, and Integrations · Performed Fiber line troubleshooting and alarm clearing · Upgraded MOBI and Corelogic GPS equipment · Performed Call testing using the Verveba software tool · Duties including performing while traveling in multiple
markets James
Services/Parsons/Nokia Aug 2014-Sep 2014 BTS CNI Field
Engineer ·
Contracted to
Nokia for Tmobile Rural America project. ·
Received
project certification During Last week of August ·
Have current
PTID and Tools ·
Have
Performed Civil installation and equipment Installation of all things
necessary to complete site. ·
Have
performed Commissioning and Cutover Integration successfully on First site
completed in Oklahoma Market.
·
Contracted as
RTL2 working Oklahoma and Arkansas on the 2C LTE carrier add project ·
Completed the
first 10 test sites to add 2100mhz RRUs and follow up with call testing and
NEA testing ·
After initial
test sites rollout included 2100, 1900, and 700 carrier add integrations with
call testing on HTC Vivid and Samsung Galaxy phones ·
Annual LTE
and WCDMA certifications are up to date ·
Active AMS
account used for reporting.
·
Installation,
commissioning, Integration, troubleshooting, and cutover of NOKIA equipment
as part of the T-Mobile Modernization project ·
Scope
included the installation and integration of Flexi equipment in multiple
configurations ·
Loaded SCF
files with BTS manager and upgrades to bring the New equipment on Air so the
existing Nortel or Ultrasite equipment could be decommissioned ·
Reconfigured
the existing AWS ·
Equipment,
changing RET naming conventions and removing existing Node extensions and
existing FPBAs when necessary to make room for the LTE equipment in the FCOA
cabinets ·
Scope also
included scheduling with GCs to be onsite for coordinated Troubleshooting so
sites could be completed alarm free ·
Troubleshooting
included T1 pinouts and cabling, RF lines, TMAs, jammed RET actuators and
antennas, Scripting issues, DC power issues, and Broken fibers at multiple
locations in RRU configurations ·
Completed
integrations with E911 testing and confirmation of successful handover calls
·
Contracted
for installation and Integration of Ericsson UMTS 3000 and 6000 series, and
LTE 6000 series equipment, completing with E911 operation verification ·
Worked on
projects in Texas, Tennessee, Kentucky, Arkansas, and Oklahoma markets
troubleshooting and testing UMTS and LTE equipment and working with other
contractors mounting cabinets, terminating power, running T1 lines,
terminating RF jumpers and alarm cables ·
Added
EMFTX-11 and ETMC-1 boards to existing cabinets and loaded the scripts for
the installation. ·
Integrations
on 3206, 3106, 3418, 3518, 6601 DUL and DUW, 1st – 5th Carriers
including the OBIF 3rd, 4th, and 5th carriers and LTE 1st and 2nd carrier ·
Completed the
AT&T online training for Supplier Awareness, Ask Yourself, and the
ATTP76300 courses ·
Trained
multiple techs to do installation, commissioning, and board adds for UMTS and
LTE as well as troubleshooting ·
Worked with a
DAS system inside a mall, and have installed OS version upgrades on the
Andrews RET control units ·
Completed the
WCDMA, LTE, and MODERNIZATION training at the Ericsson offices in Dallas and
have certificates of completion ·
Manned and
help setup a troubleshooting bridge for the north Texas LTE project after
training the techs in market ·
Worked on
three of the first five LTE markets launched by AT&T including
troubleshooting with the RF drive testers and Goodman tiger teams while
utilizing Smart Laptop and the AMS tool for reporting
·
Worked on 2nd carrier
additions of Nokia BTS equipment to H-frame support for outdoor applications ·
Assignment
was to install equipment and re-commission the tower to work on the new
configuration with expanded capacity ·
When the
equipment was reconfigured we verified operation with E911 Test calls noting
the street address, grid coordinates, carrier signal, phone number, and phase
2 connections with 911 operators ·
Nokia BTS
manager software was used for the commissioning and RET setting
·
Management
duties included store opening and closing, deposits, managing full and part-
time employees for sales and cash registers ·
Receiving and
stocking weekly deliveries and maintaining sales goals as well as end of day
cash reconciliation and training of employees
·
Loaded test
parameters for the 3G network of T-Mobile for optimization and
integration of the Ericsson 3200 series equipment ·
Set up long
calls, short calls, and data transmissions and monitored signal levels, drop
calls, hand-offs, and data speeds while traveling throughout specific routes
within the markets. ·
Worked
closely with the engineers and made suggestions, such as missing neighbors
and down-tilts based on the terrain and data collected during the routes ·
Involved with
the User Experience Optimization, which primarily tested the data
transmission speeds and adjusted the network settings ·
Used TEMS 8.2
mainly for the Ericsson equipment ·
Trained on
Agilent, Invex, and Muse ·
Worked on
UMTS, CDMA, and WCDMA equipment
·
Served with
HHB 3-13th FA BN as a Field Artillery Surveyor earning multiple
awards, decorations, and honors ·
Used PADS –
(Position Azimuth Determining System), theodolites, and other various
equipment to determine location and direction for the multiple launch rocket
systems ·
Duty was
primarily working in multiple offices in a human resources facet ·
In Iraq I
served as a gunner on a convoy escort crew with hundreds of successful
missions throughout Southwest Asia
·
Contracted to
Cingular for inventory audit project for Ericsson 2000 series
indoor/outdoor Ultrasite equipment ·
Project
included travel, locating sites, identification, verification, and tagging of
all individual equipment such as radios, multiplexers, etc., with barcodes
for scanning of inventory
·
Installation
of Nokia equipment for AT&T wireless radio sites ·
Upgraded 850
mhz to 1900 edge radios which consisted of the adding of new equipment racks
as well as changing out the existing BTS equipment ·
Traveled
various sites in southern California installing Ultrasite, indoor/outdoor
equipment ·
Some sites
where decommission and integrate and some were new construction
·
Installation
of telecommunications equipment for MCI Worldcom including DS-3, OC-48,
OC-192 ·
Duties
included installation of -48kw dc power, fiber optic lines, and laser
cards for Fujitsu, Alcatel, Siemens and Nortel equipment ·
Installed
timing racks, power bays, routers, battery racks, etc. ·
Integration,
as well as, new construction Certifications: Nokia: GSM, UMTS, AWS,
LTE, modernization, TD-LTE Ericsson: WCDMA, LTE,
Modernization AT&T: AskYourself,
Supplier Awareness, MOPS, Quality76300 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|